* The project stretches 35 miles between the Mitchell Interchange in Milwaukee, through Racine and Kenosha counties to the Illinois state line.

* The $1.9 billion project will expand the interstate to four lanes in each direction and reconstruct 17 interchanges.

* Construction began in 2009 and will be complete in 2016.

* The project is trying to eliminate left lane exits known as scissor ramps.

* Visit the project Web site online at www.plan94.org to view the latest project information including traffic and detour information, to sign up for periodic email updates, to leave a comment for the project team or to map your directions around closures.

* Call the project hotline at (262) 548-8721


2010 Construction Preview for Milwaukee County

Loomis Road (WIS 36)
Summer 2010 - Fall 2010
Resurface from WIS 100 to 27th Street, construct I-894/I-43 auxilary lane and new westbound exit ramp.

Howard Avenue
Spring 2010 - Fall 2010
Resurface from 13th Street to 6th Street

I94/43 Freeway
Early Spring 2010 - Fall 2010
Reconstruct freeway lanes, collector distributor lanes and structures on I-94 from 13th Street to Howard Avenue

Layton Avenue (County Y)
Spring 2010 - Fall 2010
Resurface from Loomis Road to 27th Street

Layton Avenue Interchange
Early Spring 2010 - Fall 2010
Reconstruct Layton Avenue bridge over the freeway, ramps and roadway from 13th Street to 20th Street
(Detour Route: College Avenue to 27th Street or Howell Avenue)

27th Street (WIS 241)
Spring 2010 - Fall 2010
Resurface from College Avenue to Howard Avenue, improve medians, install Community Sensitive Design features

I-94 Freeway
Early Spring 2010 - Fall 2010
Reconstruct freeway lanes, collector distributor lanes and structures on I-94 from College Avenue to Layton Avenue

Eastbound Airport Spur (WIS 119)
Spring 2010 - Fall 2010
Reconstruct eastbound Airport Spur bridge over the freeway and ramps to I-94


2010 Construction Preview for Racine County

County G Interchange
Spring 2010 - Fall 2010
Reconstruct I-94 freeway and County G interchange
(Alternate Routes for I-94: Frontage Roads)
(Detour Route for NB ramps: Seven Mile Road or County K interchanges)


2010 Construction Preview for Kenosha County

WIS 142 West Frontage Road
Spring 2010 - Fall 2010
Reconstruct from WIS 158 to County E
(Detour Routes: East frontage road; County E or WIS 158 interchanges)

I-94 freeway from the Illinois state line to south of WIS 50
Spring 2010 - Fall 2010
Reconstruct I-94 freeway lanes
(Alternate Routes: Frontage roads; US 45 or WIS 31)

County C Ramps
Summer 2010 - Fall 2010
Reconstruct entrance and exit ramps
*Southbound ramps and County C closed Summer 2010
*Northbound ramps and County C closed Summer 2010 - Fall 2010
(Detour Routes: Frontage roads or WIS 165 interchange)

WIS 50 East Frontage Road
Spring 2010 - Fall 2010
Reconstruct from WIS 50 to County K
(Detour Routes: West frontage road; County K or WIS 50 interchanges)

WIS 165 Northbound Ramps
Spring 2010 - Early Summer 2010
Reconstruct northbound entrance and exit ramps
(Detour Route: County C to east frontage road)